The redesigned Turner Athletic Center will serve our recreational and intramural needs during the winter, in bad weather in the spring and fall, and all year round in the evenings and on weekends. The main lobby will open to four athletic spaces: the performance basketball/volleyball gymnasium, the indoor turf field, the wrestling room, and the practice basketball/volleyball/tennis gymnasium. The latter two spaces will be in the field house of the existing Alumni Hall. New locker rooms, equipment spaces, and a weight room will also be added to the Alumni Hall. The new spaces being built are the performance gym, indoor turf field, visiting team rooms, and concession area, and will connect to the renovated Alumni Hall via a spacious and light-filled lobby.
Highlights
- General Contractor – Myers Building Systems
- Project in process as of 10/4/2023
- Redesign of Turner Athletic Center